1992 - 1996

NO

PROJECT

PLACE

JOB DESCRIPTION

PERIOD

CLIENT

1.

CONNAUGHT BRIDGE COMBINE CYCL (2 x 60MW)

KLANG

CHEMICAL CLEANING OF ECONOMISER, HEATER, EVAPORATOR

1992 / 1993

NEI PARSONS

2.

EXTENSION WORK

KAPAR

PIPING AND FLUSHING, 10 DIAMETER FULL GAS PIPING

1993

EQUATOR ENGINEERING

3.

3 x 110MW GAS TURBINE (JOHN BROWN)

PASIR GUDANG

TURBINE LUBE OIL PIPE PICKLING

1994

EQUATOR ENGINEERING (JOHN BROWN)

4.

YTL HRSG PAKA (2 x 60W)

PAKA TERENGGANU

CHEMICAL CLEANING *OF WHOLE SYSTEM INCLUDING PIPING

1995

SIEMENS POWER GENERATION

5.

YTL HRSG (2 x 60W)

PASIR GUDANG

CHEMICAL CLEANING *OF WHOLE SYSTEM INCLUDING PIPING

1995

SIEMENS POWER GENERATION

6.

KUALA LANGAT C.C.P.P

(4 x 60 HRSG)

KUALA LANGAT

CHEMICAL CLEANING *OF WHOLE SYSTEM INCLUDING PIPING

1995

ABB

7.

LUMUT POWER PLANT

LUMUT, PERAK

PICKLING OF FUEL AND GAS LINE AND BLOWING

1996

ABB


1996 - 1998

NO

PROJECT

PLACE JOB DESCRIPTION

PERIOD

CLIENT

8.

GAS TURBINE TO CCP

(2 x 60 HRSG)

SINGAPORE

CHEMICAL CLEANING *OF WHOLE SYSTEM INCLUDING PIPING

1996

SIEMENS POWER GENERATIONS

9.

LABUAN PETRONAS BORSIG BOILER

LABUAN, SABAH

CHEMICAL CLEANING OF THE WHOLE BOILER

1997

TEPAT TEKNIK SDN BHD

10.

YTL EFFLUENT DISCHARGE

PAKA TERENGGANU

DEWATERING OF EFFLUENT SLUDGE AND DISPOSAL

1997

SIEMENS POWER GENERATIONS

11.

KAPAR (2 x 500 MV)

KAPAR

PICKLING OF LUBE OIL LINE

1997

BOCCARD OIL GAS SDN BHD

12.

KLCC TWIN TOWER

KUALA LUMPUR

CHEMICAL CLEANING *OF CHILLED AND COOLING

1997

MITSUBISHI HEAVY INDUSTRY

13.

KAPAR POWER STATION

(2 x 500 MV)

KAPAR

TURBINE CONDENSATE PIPING

1997 / 1998

E.E.S.B